Al Gharbi Project

Berliner wall excavation shoring with raking props at the Al Gharbi project, with the supplied design considering excavation to 13.5 metres.

Project overview

The retaining arrangement combines vertical steel beams, timber lagging and raking props within the excavation. Site photographs show the prop levels and connection arrangements, together with details of the timber infill along the retaining faces.

Retaining system
Berliner wall with raking props
Project status
Completed
Owner
Al Gharbi Contracting Company
Assessed excavation depth
Up to 13.5 metres

From design to construction

An engineering design detail

The engineering report assesses an excavation depth of 13.5 metres and considers excavation stages and the contribution of the props to the retaining system. The selected drawing excerpt shows part of the internal prop arrangement; site photographs provide the corresponding construction perspective.

Selected shoring design detail for Al Gharbi Project

The next step

Let’s review your site requirements

Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps