Engineering design and construction for excavation shoring: Berliner walls, concrete infill walls, reinforced concrete pile walls and shotcrete with rock nails, together with groundwater dewatering.
Excavation shoring
Start with the project scope and the relationship between design, retaining systems and groundwater dewatering.

01
Shoring system design
Review of site information, ground investigation data and loads to design the support system, details and construction stages within the agreed engineering scope.
System concept; construction details are defined by the project design

02
Berliner walls
Vertical steel beams with timber lagging between them, installed progressively with excavation in accordance with the approved design and sequence.
System concept; construction details are defined by the project design
03
Concrete infill walls
A retaining system comprising vertical steel beams with concrete infill cast between them, with reinforcement, connections and construction stages specified by the design.
System concept; construction details are defined by the project design

04
Reinforced concrete pile walls
Retaining walls formed with secant piles, contiguous piles, or spaced piles with shotcrete infill, according to the selected system and approved details.
System concept; construction details are defined by the project design
05
Shotcrete with rock nails
A support system combining shotcrete with nails installed into the rock mass, together with reinforcement, drainage and construction details specified by the design.
System concept; construction details are defined by the project design
06
Groundwater dewatering
Solutions to control groundwater inflow or lower levels in the work area, with defined pumping, discharge, operation and monitoring requirements.
System concept; construction details are defined by the project design
The next step
Let’s review your site requirements
Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps