Concrete infill walls with steel beams

A retaining system comprising vertical steel beams with concrete infill cast between them, with reinforcement, connections and construction stages specified by the design.

Service scope

Concrete infill walls

International Rafedah Piles Company constructs retaining walls using vertical steel beams with concrete infill cast on site. Drawings define beam arrangement, infill dimensions, reinforcement, connections and excavation and construction stages.

Concrete infill walls

System concept; construction details are defined by the project design

Steel members and concrete infill

The vertical members and concrete infill form the designed retaining system. Infill, reinforcement and connection details are reviewed before construction.

Coordinating casting and excavation

The sequence defines installation, infill preparation, casting, curing and inspection, coordinated with excavation stages and the required support elements.

Project requirements

Selection and detailing depend on ground conditions, groundwater, excavation depth, loads, boundaries and movement limits. Records and inspections follow the project specifications.

Steel beams and reinforced concrete infill

The system uses vertical steel sections with reinforced concrete cast in the spaces between them to form the retaining face. Drawings define reinforcement, infill thickness, connections to the beams and construction stages. It is distinct from reinforced concrete pile walls and does not mean a diaphragm wall. Concrete infill is assessed alongside timber lagging and pile wall alternatives in relation to ground conditions, loads, groundwater and site constraints.

Details coordinated before construction

The review covers interfaces with boundaries and foundations, space for formwork and reinforcement, excavation and casting stages and the positions of any additional support required by the design. Construction follow-up addresses materials, reinforcement, connections and levels against approved drawings and the project inspection records. A standard detail is not assumed to suit every site: arrangements, sequencing and working interfaces are coordinated for the individual project.

Preparing the enquiry and defining the scope

Clear project information helps the proposal reflect the site requirements accurately. The company reviews available inputs and identifies missing information before the proposal defines the included works, supply and construction boundaries, coordination, inspections and records applicable to the project. Commercial comparison should consider levels, quantities, programme and interfaces rather than the price of an isolated item. Provide the available drawings and reports with the inputs below and identify whether the assignment requires a design study, construction to approved drawings or coordination of both stages. Access and working restrictions, responsibilities and approval points should also be stated so the next steps and expected deliverables are clear before the assignment begins.

  • Wall lengths, excavation levels and site boundaries
  • Steel sections, reinforcement and concrete infill details
  • Formwork and casting access and excavation sequence
  • Interfaces with foundations and additional supports

Project questions

Before construction

Practical answers to help define the scope and prepare site information

What are the main components?

Vertical steel beams with concrete infill cast between them, together with reinforcement and connections specified in the design.

The main distinction is the infill material: timber lagging in a Berliner wall and concrete cast on site in this system. Each system has its own design details.

Design calculations establish them from loads, ground conditions, excavation depth, beam arrangement and project requirements; a single standard size is not assumed for every site.

No. This system uses vertical steel sections with reinforced concrete infill cast between them. A reinforced concrete pile wall is formed from concrete piles in secant, contiguous or spaced arrangements. The design identifies the function of each member and its infill and connection details and assesses suitability for the site.

The scope identifies steel supply and installation, reinforcement, formwork, concrete, excavation, additional supports, inspections and groundwater requirements as applicable. Stating these items helps compare proposals that may use a similar system name but cover materially different construction responsibilities.

Details may vary between retaining faces as depths, loads, adjacent conditions and strata change. Drawings coordinate sections, infill, levels and interfaces. A single detail is not assumed to suit the entire perimeter or remain appropriate after the project inputs have been revised.

The next step

Let’s review your site requirements

Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps