International Rafedah Piles Company
Equipment fleet
Equipment selection at International Rafedah Piles Company depends on the retaining system, construction method, ground conditions, working space and access constraints.
Selected for the work scope
Drilling, steel beam and pile installation, concrete infill, shotcrete and dewatering requirements are reviewed within the agreed project scope.
Suited to the site constraints
Working area, available headroom, equipment movement and surrounding activities are considered when coordinating the construction plan.
Equipment inventory
Principal equipment and accessories
| Description | Nos |
|---|---|
| Piling Machines | |
| Bauer BG 40 | 1 |
| Bauer BG 28 | 2 |
| Bauer BG 36 | 1 |
| Shotcrete Machines | |
| Turbosol TB30 | 2 |
| Shoring Equipment | |
| Vibratory Hammer | 3 |
| Anchor Machine C6 | 1 |
| Hydraulic Driller | 1 |
| Crawler Cranes | |
| Sany 60 Tons | 3 |
| Zoomlion 55 Tons | 2 |
| Shoring Accessories | |
| H-Beams HEA200 L12.0m | 200 |
| H-Beams HEA240 L12.0m | 230 |
| Turbo 80 Grouting Set | 2 |
| H-Beams HEA300 L12.0m | 55 |
| U Channel U125 L12.0m | 65 |
| Anchor Stressing Wires 12.7 | 8 |
| Dewatering Equipment | |
| Water Jet for Well Point System | 2 |
| Complete Dewatering Well Point System 6″ | 8 |
| Submersible Mud Pump 3″ | 6 |
| Submersible Mud Pump 2″ | 10 |
| Dewatering Accessories | |
| Well Points L 6.0m | 348 |
| Suction Hose 6″ L 6.0m | 9 |
| Discharge Hose 6″ L100.0m | 11 |
| Decantation Tank 6 x 2.4 x 2.4 | 7 |
| Others | |
| Welding Plants 500 A , Diesel | 9 |
| Piling Accessories | |
| Bucket 1200 | 8 |
| Core 1200 | 5 |
| Bucket 1000 | 4 |
| Core 1000 | 5 |
| Bucket 900 | 8 |
| Core 900 | 3 |
| Bucket 800 | 7 |
| Core 800 | 9 |
| Bucket 600 | 6 |
| Core 600 | 5 |
| Casing 1200 | 12 |
| Casing 1000 | 22 |
| Casing 900 | 15 |
| Casing 800 | 25 |
| Casing 600 | 28 |
| Clivio Grouting Set | 3 |
The next step
Let’s review your site requirements
Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps
