An RPC project
STC Project, Al Mursalat, Riyadh
Excavation shoring design and construction for STC Project, Al Mursalat, Riyadh, Al Mursalat, Riyadh, to a maximum depth of 15 metres. Reinforced shoring walls tied by steel cables to rear anchor footings to resist rotation and lateral displacement.
Project overview
International Rafedah Piles Company designed and constructed excavation shoring for the STC project in Al Mursalat, Riyadh, to a depth of 15 metres. Reinforced shoring walls are tied by steel cables to rear anchor footings to resist wall rotation and lateral displacement. The site photograph records the executed wall and connection details.
- Location
- Al Mursalat, Riyadh
- Shoring system
- Reinforced shoring walls tied by steel cables to rear anchor footings to resist rotation and lateral displacement
- Maximum excavation depth
- 15 metres
- RPC scope
- Design and construction
Site photography
A closer look at the project
Related services
Excavation depth and load path
The STC project in Al Mursalat, Riyadh reached a 15 m excavation depth. RPC designed and constructed reinforced walls tied by steel cables to rear anchor footings to resist rotation and displacement.
Reading the constructed arrangement
The walls, steel cables and rear footings form the retaining system’s load path. The site photograph records the constructed arrangement; element dimensions, details and construction sequence remain specific to the project design.
Engineering context
RPC delivered the design and construction of shoring for a 15 m excavation. Reinforced shoring walls are tied by steel cables to rear anchor footings to resist rotation and displacement. These footings and ties form part of the retaining system; their arrangement is read together with the site boundaries and excavation sequence in the project drawings.
The next step
Let’s review your site requirements
Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps
