Excavation shoring design and construction in Riyadh

International Rafedah Piles Company provides six specialist service areas: engineering design, Berliner walls, steel beam walls with cast concrete infill, reinforced concrete pile walls, shotcrete with rock nails, and groundwater dewatering. Site information informs system selection and the agreed scope.

Documented experience since 2018

Excavation shoring design and construction in Riyadh

Based in Riyadh, International Rafedah Piles Company designs and constructs excavation shoring systems. Each project starts with its soil report, excavation depth, site boundaries and neighbouring structures to establish the appropriate system and construction details.

Our work includes STC in Al Mursalat with a 15 m excavation and Al Fawzan in Al Nakheel with 6,800 m² of shoring and depths from 6 to 15 m. RPC delivered design and construction for both projects.
Company management-system certifications cover ISO 9001:2015 quality, ISO 14001:2015 environmental management and ISO 45001:2018 occupational health and safety. View the certificates, issuers and dates.

Start with the site information

Share the ground investigation report, drawings, levels, excavation depth, loads and adjacent buildings and utilities, together with boundaries and access constraints.

Select the system through design

Vertical elements, infill and construction methods vary with ground conditions, groundwater, loads and adjacent structures. The design defines details, excavation stages, inspections and monitoring.

Define the scope before construction

The proposal sets out design, construction, equipment, checks, monitoring and coordination responsibilities. Groundwater dewatering can have its own separately agreed scope.

Design and construction services

Shoring system design

01

Shoring system design

Review of site information, ground investigation data and loads to design the support system, details and construction stages within the agreed engineering scope.

System concept; construction details are defined by the project design

Berliner walls

02

Berliner walls

Vertical steel beams with timber lagging between them, installed progressively with excavation in accordance with the approved design and sequence.

System concept; construction details are defined by the project design

Concrete infill walls

03

Concrete infill walls

A retaining system comprising vertical steel beams with concrete infill cast between them, with reinforcement, connections and construction stages specified by the design.

System concept; construction details are defined by the project design

Reinforced concrete pile walls

04

Reinforced concrete pile walls

Retaining walls formed with secant piles, contiguous piles, or spaced piles with shotcrete infill, according to the selected system and approved details.

System concept; construction details are defined by the project design

Shotcrete with rock nails

05

Shotcrete with rock nails

A support system combining shotcrete with nails installed into the rock mass, together with reinforcement, drainage and construction details specified by the design.

System concept; construction details are defined by the project design

Groundwater dewatering

06

Groundwater dewatering

Solutions to control groundwater inflow or lower levels in the work area, with defined pumping, discharge, operation and monitoring requirements.

System concept; construction details are defined by the project design

Choose the shoring system around the site constraints

Selecting an excavation shoring system starts with the ground investigation, rock conditions, excavation depth and groundwater level, together with boundaries, neighbouring buildings, roads and existing utilities. Loads from nearby structures and equipment, working space and basement construction stages also matter. A system name or excavation depth alone does not establish whether a solution suits a site.

The design defines the vertical elements, infill, support arrangements and excavation sequence. The feasibility and boundaries of ground anchors or internal props are reviewed before selecting a solution. Comparing Berliner walls and reinforced concrete pile walls therefore requires the site constraints, neighbouring assets and scope to be considered together.

Coordinate construction and monitoring

Construction starts with a review of the drawings, levels, existing services and work boundaries. Excavation stages are coordinated with the retaining elements, infill and support required by the design. Where groundwater is present, the dewatering, discharge and monitoring scope is coordinated with the excavation and shoring works.

Project requirements define inspection records, responsibilities and any movement or groundwater monitoring needed. Changes in ground or neighbouring conditions are referred for review through the agreed project process. An illustration or a previous project is a useful reference, but does not replace a site-specific assessment and design.

Compare against site information

Which shoring system fits your project?

The design compares alternatives against ground, groundwater, excavation depth, loads, neighbours and site boundaries. This overview is not a site-specific engineering recommendation.

Berliner walls

Vertical steel sections with timber infill installed in coordination with staged excavation.

Assess ground, groundwater, neighbours and support requirements.

Concrete infill walls

Vertical steel sections with reinforced concrete infill and designed connections and casting stages.

Coordinate infill details, construction stages and support arrangements.

Reinforced concrete pile walls

Secant, contiguous or spaced reinforced concrete piles, with designed shotcrete infill between spaced piles.

Review continuity, joints, groundwater and equipment working space.

Shotcrete with rock nails

Shotcrete and rock nails with designed reinforcement and drainage.

Assess rock mass conditions, details and excavation stages.

A clear basis for cost and programme

Shoring cost follows the quantities, design and construction scope rather than depth alone. Excavation perimeter, ground, groundwater, infill, supports, access, equipment, testing and monitoring all matter. The enquiry guide sets out the information for a comparable proposal.

Programme assessment follows system selection, quantities, excavation sequence, site preparation, materials, equipment availability, inspection points and basement interfaces. The programme should identify assumptions, constraints and stages rather than a fixed duration for every project.

Documented Riyadh project experience

STC excavation shoring works in Riyadh

STC, Al Mursalat

A 15 m excavation with reinforced walls tied by steel cables to rear anchor footings. RPC scope: design and construction.

Berliner wall at Al Fawzan in Riyadh

Al Fawzan, Al Nakheel

Berliner walls at depths of 6–15 m, covering 6,800 square metres of shoring works. RPC scope: design and construction.

Kings Square project works in Riyadh

Kings Square, Riyadh

Reinforced concrete pile walls and multi-level anchors, with a 14.5 m excavation level difference in the documented section.

The project pages show site photographs and available records. Figures describe each project’s scope and are not a guarantee for another site.

Guides for planning your excavation

Excavation shoring beside neighbouring buildings in Riyadh

An existing building or road beside an excavation adds requirements that belong in the initial assessment. This guide explains the information to gather and how it informs shoring design and monitoring scope.

How to choose an excavation shoring system

Shoring selection starts with the site and project scope. This guide sets out questions for comparing alternatives with the engineering team, without assigning a universal depth limit to each system.

Excavation shoring monitoring and construction sequence

Shoring quality depends on coordinated design, construction and follow-up. This guide explains what to define in the work scope and project plan, without prescribing monitoring thresholds for every site.

Shoring design and construction since 2018

International Rafedah Piles Company was established in 2018 and is based in Riyadh. Its scope includes engineering design, excavation shoring, reinforced concrete pile walls and groundwater dewatering. The equipment page documents the fleet, while the credentials page distinguishes company management system certificates from individual professional qualifications.

From Riyadh to projects across Saudi Arabia

Our base is Riyadh. We receive enquiries for excavation shoring design and construction and groundwater dewatering projects across Saudi Arabia. Site conditions, the soil report and the agreed scope determine the technical solution and delivery requirements. Our work beyond Riyadh includes the tourist hotel in Hail using a Berliner wall and the Dumat Al Jandal pumping station using a Berliner wall and internal steel bracing.

The next step

Let’s review your site requirements

Share the available drawings, ground investigation report, excavation depth and required scope so we can discuss the requirements and next steps